Architectural Committee
The Architectural Committee shall examine and approve or stipulate to reasonable
changes or alterations and plans for any structured dwelling unit or outbuilding
to be constructed on any lot. Original colors and any change of color from
the original paint MUST BE APPROVED by the Architectural Committee. No bright
colors shall be allowed and colors on general shall be limited to earth tones,soft
blue,soft green, soft yellow,white, gray, and natural wood colors. Said changes
or alterations in plans duly submitted to the Committee shall be made only
in the best and continuing interest of maintaining a superior tone and quality
of architecture throughout the subdivision.
3.3 Plans and Specification
No dwelling unit, garage or outbuilding shall be constructed, erected, commenced
or placed upon any lot until a complete set of plans therof including front,
side and rear elevations along with floor plans for each floor and basement,
exterior color schemes thereof and plot planning indicating and establishing
the exact location of any structure shall have been first submitted in writing
to the Architectural Committee for approval and said approval obtained in
writing from the Architectural Committee.
3.4 Redecorating and Alterations
If any redecorating or alterations of the exterior of any existing structure
be proposed without remodeling or adding to or effecting structural changes
in any existing structure it shall be necessary only to file an exterior color
scheme of such changes and to receive written approval of the Architectural
Committee prior to commencing said work. When the exterior, redecoration,
alteration, addition, or remodeling affects structural changes, the provisions
of paragraph 3.3 must be complied with.
3.5 Approval of Plans, Alterations, and Color Schemes
Approval by the Architectural Committee of any given plans, alteration, or
color change may be withheld due to noncompliance with any of the specific
requirement of this declaration of restrictions or due to reasonable disapproval
of the Architectural Committee as to the location of the building site upon
any lot, appearance, construction material to be used therin or thereon, the
lot grading p;an and the harmony of the proposed structure with the surrounding
area and homes. At no time shall the Architectural Committee action or any
matter submitted before it take more than forty-five (45) days from the date
of said submission. In the event that the Architectural Committee approval
or disapproval is not received at the end of said forty-five days, then such
submissions shall automatically be deemed approved.
2003 Architectural Committee
Al Dodd------------------KC Mares----------------------------Frank Capallupo
2450 Solitude Dr------------------2460 Telluride Dr----------------------2555
Whistler Ridge
Reno, NV 89511------------------------Reno, Nv 89511-----------------------Reno,
Nv 89511
Tel# 853-1478--------------------------Tel#1-408-203-8638-------------------------Tel#
853-6728
index